E-MAIL: sales@bdbrave.com
Your location:Home > Technical info
Technical info
Note for CD1 electric hoist
1 CD1 electric hoist staff, must pass through the professional learning, and accept the safety technology training, the appraisal national or competent departments for nuclear, has issued by local departments in charge of the "special operation license", be engaged in the command and operation, is strictly prohibited without a license.
2 in the use of CD1 electric hoist before the check safety and technical conditions hook, wire rope, reducer and other vulnerable parts.
3 using CD1 electric hoist, prohibit the idlers into hoisting dangerous area and sent care.
4.CD1 electric hoist placed or bundled items must be standardized, comply with the requirements in the hoisting of hoisting.
7, in the brake safety device failure, hook nut anti loose device, wire rope to be scrapped and other prohibited under the lifting operations.
8 hanging, hanging binding is not strong or the imbalance may not be lifting operation, lifting edges and the slip between the steel wire rope without liner.
No lifting operation 9 can not see the space, hanging and command signal.
10 in the work or rest, the hanging, hanging basket, sling and cable suspended in the air.
11 in the lifting work, not to inspect the hoisting machinery and maintenance. No adjustment of brake lifting mechanism have loads.
12 decentralization hanging objects, no free fall (slip). Shall not use the limit position for parking.
top